Construction : 2005-6 |
|
![]() Site work and foundations, 2005 |
|
![]() View of site work and foundations from Sprau Tower, 2005 |
![]() Erecting steel framing, 2006 |
![]() Steel framing on plaza side; curved wall of future lecture hall visible, 2006 |
![]() Framing and roof construction, 2006 |
![]() Site work - south side of RCVA |
![]() Installing structural wall panels in gallery, 2006 |
![]() Installing c opper cladding, 2006 (Sprau Tower just visible over roofline) |
![]() Copper cladding and second floor connection to Miller Parking Ramp, 2006 |
![]() Construction of second floor connection to Dalton Center, 2006 |
![]() Gallery construction 2006 |